top of page

Drainage contractor in Frankton, Jacks Point and the Remarkables corridor

Aug 26
3 min read

If Queenstown has a growth corridor, it runs from Frankton out past the airport to Remarkables Park, Hanleys Farm and Jacks Point. Flat by local standards, close to the network, and carrying most of the district commercial floor space and a large share of its new housing. It is also where a drainage contractor spends most of a Queenstown working week.

This page covers what drainage and civil work looks like across the Frankton corridor.

Why this corridor is different from the rest of the basin

Two things set Frankton apart from Queenstown Hill or Fernhill. The first is grade: much of the corridor is comparatively flat, which means gravity systems that work and trenches that are not fighting the site. The second is congestion. This is where the district commercial services are concentrated, so trenching happens around live water, wastewater, power, gas and telecommunications rather than through open ground.

Live services change the method before they change the price. Where a service cannot be safely located by machine, the answer is hydro excavation and non-destructive digging, which exposes services without the risk a bucket brings.

On the Frankton corridor the constraint is rarely the ground. It is everything already buried in it.
Narrow trench with bedding metal placed alongside a commercial building

Commercial and visitor accommodation work

Frankton and Remarkables Park carry retail, trade, light industrial and visitor accommodation development, and that work brings its own drainage demands: site stormwater with detention or attenuation, trade waste and grease interception where the use requires it, and connections into a network that is already carrying a lot. Programmes tend to be tight and staged around a tenant opening date, which puts a premium on a contractor who can sequence around other trades. See commercial and site drainage.

Residential growth at Hanleys Farm and Jacks Point

The residential end of the corridor is subdivision work and the servicing that follows it: reticulation through new stages, laterals to lots, and connections as houses are built out. Jacks Point and Hanleys Farm have been delivering lots for years, and the drainage work follows the staging rather than arriving all at once. Our approach to that work is in subdivision civil works in Queenstown.

Stormwater and the lake

Frankton sits on the lake edge and the Kawarau outflow, which puts most of the corridor close to water that the regional council watches. Sediment control on any open earthworks needs to be genuine, built to the GD05 standard Otago applies, and detention requirements on commercial sites are increasingly a design input rather than an afterthought.

Connections in this corridor

Connection into the council network follows the standard district process: an application per property, a CC reference, a one year approval expiry, and physical connection restricted to contractors council has approved for network work. Because the Frankton network is busy and well developed, the practical questions are usually about capacity and location rather than availability. The process is set out in QLDC three waters connections.

What we do here

  • Commercial site drainage, stormwater and detention systems

  • Foul sewer and stormwater reticulation on residential stages

  • Laterals, connections and lot servicing

  • Trenching around live services, including non-destructive location

  • Bulk earthworks and site shaping

  • Erosion and sediment control to regional council requirements

Questions we get asked

Do you work around live services?

Routinely. Where records are uncertain or the service is critical, we expose it with non-destructive methods rather than a machine.

Hydro-excavation truck working under lights on a live services dig at night

Can you work to a staged commercial programme?

Yes. Most Frankton commercial work is staged around other trades and an opening date, and the drainage sequence gets built around that.

Is detention required on every commercial site?

Not every site, but it is common and increasingly expected. It is a design question for your engineer and council rather than something to determine on site.

How far does your Queenstown coverage extend?

Across the Wakatipu, including Arrowtown and Lake Hayes, plus the Upper Clutha and Central Otago.

Draeinail Construction works across the Wakatipu, Upper Clutha and Central Otago from a local yard with a local crew. Request a quote or call Darryn Muir on 021 271 0035.

Related pages

 
 
bottom of page