top of page
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Auranga Subdivision
Location
Drury, South Auckland
Date
2017–2022
Project type
Subdivision
Working alongside Dempsey Wood, Draeinail completed sewer and stormwater works for a new subdivision in Drury. The scope included installing an 800 mm diameter PE transmission pipeline at depths of 6–7 metres and a rising main beneath the Hingaia Estuary to the Hingaia pump station.
The team also assisted with the installation of three pump stations, using excavators ranging from 5 to 30 tonnes. Slide rail trench shoring was used to support deep excavations and manage challenging ground conditions.






































bottom of page

